New plants built from a definition instead of manual builds: a PowerShell automation running through Azure DevOps configures server hardware, builds Hyper-V clusters, deploys VMs and connects every site centrally via Azure Arc.

Industry

Industrial manufacturing

Size

Plants on several continents

Published

July 2026

01

Starting point

New plants on several continents each needed their own data centre build: server hardware, Hyper-V clusters, virtual machines and applications from scratch, often at sites with limited connectivity and strict network segmentation. Built manually, every configuration risked ending up slightly different.

02

Approach

WORXSPACE built a full data centre automation solution on PowerShell, executed through Azure DevOps pipelines. Each site is described in a declarative definition; the automation then configures the server hardware via Dell iDRAC, builds the Hyper-V clusters, deploys the virtual machines, enables Azure Arc for central management and rolls out applications with PSADT. The demanding network and security constraints of each site, from limited connectivity to strict segmentation, feed directly into the definitions.

03

Result

  • New sites are stood up from a definition instead of a manual build
  • Identical, repeatable configuration across every plant
  • Central management via Azure Arc, even at remote sites with limited connectivity

Technologies used

PowerShell · Azure DevOps · Hyper-V · Azure Arc · PSADT · Dell iDRAC

Anonymised. Reference available on request during the intro call.

Where does your business stand?

30 minutes with an engineer — not a sales call. You'll speak directly with the people who'd actually run your environment.

Next stepSee the matching offer